Current
side effects.

A public note about what the studio is building, testing and refusing to pretend is finished.

Costa BlancaPrototype modeEnquiry channel open
Studio state / No launch-day fossilisation

What has our attention.

The site is a working surface, not a completed monument. These are the things currently receiving unreasonable amounts of thought.

Building / 01

ECSTA.SI itself

Turning the studio site into a release channel with real case studies, playable tools, bilingual routes and fewer assumptions hidden in JavaScript.

Building / 02

S1 Forge

Improving image preparation and machine workflows for laser work so fewer materials are sacrificed to the gods of test grids.

Building / 03

Auction Intelligence

Converting scraped lots into useful rankings, price signals and decisions instead of merely producing a larger pile of data.

Exploring / 04

Small useful machines

Interactive brand tools, generators and automations that solve one irritating problem well enough to deserve their own Drop number.

Operating notes / Expectations attached

How work happens now.

Direct collaboration, early prototypes and honest constraints. No account-manager relay race and no ceremonial presentation containing forty-seven slides about circles.

Current rules

  • Useful before impressive, then ideally both.
  • One strong idea beats six nervous directions.
  • Working prototypes expose nonsense earlier than meetings do.
  • Capacity and deadlines are discussed before promises are made.
  • Interesting problems receive more enthusiasm than fashionable categories.
Open channel

Something worth
interfering with?